Project design, supply and installation of the ready-to-use equipment including:
Design stage:
- Pre-screening facility.
- Develop a sketch project.
- Develop a working draft.
- Agreement of the project in the relevant state bodies (Architectural Control, Energy Supervisor Committee, State Fire Control, SanEpidemiological Station).
Installation stage:
- Works on preparing the site for the equipment installation.
- Construction and installation works.
- Electrical and installation works.
- Installation of additional engineering systems (if necessary).
- Delivery of the equipment to the object implementation.
- Rigging works (including the high complex ones).
- Start-up operations.
- Head assembling.
- Training of technical staff of the customer of the basic knowledge of working with the equipment.
The duration of the guarantee stage:
- Warranty service.
- Online free diagnosis.
After-guarantee service:
- Periodic inspection.
- Preventative work and maintenance.
- Service contracts for all-in maintenance (4 times per year).
- Delivery of recommended APP-sets.
- Replacement of defective components and assemblies.
- Serving on a call with a fixed fee for work.
Additional services:
Training and certification of specialists of organizations, operating as regional service centers for the equipment maintenance provided by TOPOL-ECO.
Warranties
TOPOL-ECO companies group offers 3-year warranty on their products