Nonvolatile TOPBIO installation is intended for the treatment of domestic wastewater, with the full oxidation. Installation and its use are only possible in soils with a high of filtration rate.
Technical data of TOPBIO installations are shown in the table. Structurally, the installation is a rectangular piece of polypropylene self tank with integrated filter, developed by professionals using the latest advances in wastewater treatment. A distinctive feature of the TOPBIO installation is that there are two processes taking place an aerobic and anaerobic. This innovation helped to get high results in performance of wastewater treatment along the absence of the air via compressor.
The TOPBIO installation purifies domestic waste waters and bring their quality up to the requirements of SanPiN 4630-88 «Sanitary rules and norms of protection of surface waters from pollution», GOST 25298-82 «compact installations for the treatment of domestic sewage. Basic parameters and dimensions subject to the provisions of 40-03-99, and SNIP SNIP 2.04.03-85 «Sewage. External networks and facilities ».
Initial water by gravity to the lead plates kovym pipes (for exteriors), laid with a gradient to ensure nezamedlyaemye skoros ty flow of waste water is supplied by the first camera installation «TOPBIO», fulfilling the function of sediment (anoksikatora). After the release of water from coarse impurities drains by gravity through the vertical slits are received in the second chamber (metanreaktor) of the «TOPBIO», where the better lighting ing waste water by oxygen-free brozhe of.
In the third set the chamber water flows through the vertical slits. A third flow cell equipped with a working design, which is mounted filter *, which provides attachment of aerobic-anaerobic microflora. The third chamber is provided by the direction of movement of the flow of waste water (DIT movement occur from bottom to top).
To the fourth camera of the TOPBIO installation water flows through the spillway ** installed below the tray of the main pipe. In the fourth chamber drainage water passes through a second filter set, but not from the bottom to the top as in the third chamber but top-down. Thus, more complete oxidation of wastewater with aerobic-anaerobic micro flora is made.
Into the fifth chamber the treated waste water goes through a hole in the partition process between the fourth and fifth camera. In the fifth chamber the separation of the weighted silt from clean water by gravity is taking place.
* bio filter provides increased speed of the waste water purification process.
** over fall provides the constant filling up of the installation working chambers and prevents the possible flooding of the installation in the case of increasing of the ground water level, ensuring the stability and reliability of your setup.
Installation can also be equipped with additional equipment to improve the quality of wastewater treatment. Update is possible.
The quality of treated waste waters meet the requirements of SanPiN 4630-88, approved July 4, 1988.
Number of served people (250 liters per person. / Day): 3 - 6
Admission of contamination (BPK5 kg / day): 0.5
Productivity, m3/sut: 1.5
The temperature of raw sewage, Co: not less than 5, not more than 50
Flow of sewage in the favorable terrain: non gravity and non pressure, using elements of the TOPBIO installation by gravity.
|
«TOPOL-ECO»® Company Group
Moscow, Bibirevskaya st. 10, building 1 phone: (495) 789-69-37, 789-84-37 |
|